Mining Equipment Repair & Management
Total Solution Provider
MES EQUIPMENT LIMITED was established in Zambia in April 2019 and has operated in Namibia since April 2023. With a Komatsu-trained professional team we provide component overhaul, machine rebuild, on-site contracting and full equipment outsourcing for mining customers across Southern Africa — maximising fleet availability and lowering the cost of ownership.
SITE PHOTO — LARGE WHEEL LOADER / MES SERVICE TEAM
About MES
Rooted in Southern Africa's mines, the equipment partner your operationcan count on
MES EQUIPMENT LIMITED was established in Zambia in April 2019 and has operated in Namibia since April 2023. Headquartered in Chambishi, Copperbelt Province, the company specialises in total mining-equipment repair and management solutions.
Sales revenue has grown from USD 2.12 million in 2019 to about USD 18.96 million in 2025, with a team of 316 — one of the leading equipment-service and parts suppliers for mining in Southern Africa.
- Management team drawn entirely from the Komatsu after-sales system — 20 years' experience on average
- Four service tiers — overhaul / rebuild / on-site contracting / outsourcing — covering the full equipment lifecycle
- Two 20,000 m² operating centres — Zambia and Namibia — with turnover stock for fast local response
Four Service Tiers · Specialists Doing Specialist Work
From a single component overhaul to whole-mine equipment outsourcing — flexibly combined to match your operating conditions.
Component Overhaul
Remanufacture of engines, hydraulic pumps, transmissions, hydraulic motors, final drives, PTOs and axles.
View details →Machine Rebuild
Core component overhaul plus PCR, 1-year whole-machine warranty — 29 units delivered since April 2023.
View details →On-site & Parts Contracting
Daily checks, maintenance, repairs, overhaul planning and consignment stock — 85% availability, zero customer inventory.
View details →Full Equipment Outsourcing
Settlement by output: you simply operate the machines while our interests are aligned through production — a true win-win.
View details →Four Reasons Customers Choose Us
Komatsu-trained Team
Our entire management team comes from the Komatsu after-sales system, averaging 20 years of service each — proven expertise.
Local Turnover Stock
Major components for mainstream models held in stock in both Zambia and Namibia — engines, pumps and final drives swapped at breakdown.
Proven Overhaul Capability
Zambia's largest engine dyno test bench (up to 3,300 kW, covering Cummins QSK78) — every overhaul verified with data.
Warranty We Stand Behind
1-year unlimited-hours warranty on rebuilds; super warranty of 12,000 hours / 3 years — written into the contract.
Proven Results · Measured in Operating Hours
Three long-term on-site contracts, three sets of data you can verify in the field.
Parts Consignment & On-site Service for 8 Komatsu Machines
Unit #2 PC2000-8 has reached 90,161 operating hours (as of May 2026); several machines exceed 80,000 SMR hours while maintaining high availability.
29 Machines Rebuilt & Remanufactured at Husab
29 units delivered since April 2023 (10 in 2023, 12 in 2024, 7 in 2025), plus an A1&A2 + VMI contract signed on 38 units — 12-month unlimited-hours warranty; scored 83% in SU's 2025 SHEQ audit, the highest among peer contractors.
On-site Service & Parts Contract on 34 Machines
PC2000-8×3, PC1250-8×8 and HD785-7×20 under A3 on-site service and parts contracting, with consignment stock on site — zero customer inventory.
Company Updates
Resident Fleet at Luanshya Copper Mine Passes 90,000 SMR Hours
Under the A3 service & parts contract with CNMC Luanshya, unit #2 PC2000-8 reached 90,161 operating hours as of May 2026, with several machines above 80,000 SMR hours at high availability.
Service Performance2025 Sales Revenue Reaches Approx. USD 18.96 Million
Sales revenue reached about USD 18.96 million in 2025 with a headcount of 316 — sustained growth every year since 2019.
Company NewsCGN Husab 2025 SHEQ Audit: MES Scores 83%
MES scored 83% in Swakop Uranium's 2025 SHEQ audit — the highest among peer contractors; annual targets of 0 HPI and 0 LTI were met.
Safety & EnvironmentLower Cost · Higher Output · Win-Win
From a single component overhaul to whole-mine contracting — tell us your machine models and operating conditions for a tailored service proposal.