Our Strength
Facilities in both countries, turnover stock, overhaul capability, warranty and safety systems — reliability broken down into things you can verify on site.
Zambia + Namibia —two 20,000 m² operating centres
The Chambishi operating centre in Zambia covers about 20,000 m², with a 2,000 m² parts warehouse, a 4,000 m² professional repair workshop, offices and staff quarters under 5S standardised management. The Arandis operating centre in Namibia covers another 20,000 m² with a 2,000 m² warehouse, plus two self-built repair workshops, a machining centre and a VMI warehouse at Husab Mine.
- 40+ professional technical staff and 120+ local employees in Zambia — localised operations in both countries
- Repair workshops, washing & painting bays, overhead cranes and living quarters at both centres
- The Husab site workshop runs an 80-ton crane and a machining centre (large lathe, radial drill, cylinder test rig)
Dyno Test
From Intake to Delivery in Four Steps
Every step has an owner, a standard and a written record — progress visible at any time.
Intake & Assessment
Site inspection or component receipt; teardown inspection followed by an overhaul proposal and quotation within 24 hours.
Overhaul Execution
Overhaul performed to Komatsu-standard procedures, with key components inspected item by item and the process documented on camera.
Dyno Acceptance
Engines run on the 3,300 kW dyno for measured power curves; hydraulics bench-tested — the data ships with the unit.
Delivery & Warranty
1-year unlimited-hours warranty on rebuilds; qualifying machines enjoy the super warranty of 12,000 hours / 3 years.
Three Layers of QC — Genuine and Traceable
Major-Assembly Stock Control
Engines, pumps and final drives for PC2000-8, HD785-7, D375A-6, QSK78 and other mainstream models held in stock, all batch-documented and traceable — no untraceable loose parts.
In-process Inspection
Key operations inspected to Komatsu standards; engines dyno-tested, hydraulics bench-tested, electronics power-tested — all data on record.
Archive Traceability
An overhaul file for every machine: inspection data, replaced-parts list, dyno curves and photo records — one machine, one traceable file.
Commitments in Black and White
They go into the contract. If we can't do it, we don't write it.
| Service item | Commitment | Notes |
|---|---|---|
| Quotation | ≤ 24 hours | Overhaul proposal and quotation within one working day of receiving the model and fault description |
| Stock component exchange | Swap at breakdown | Mainstream-model component stock held in both countries — exchange first, overhaul after, minimising downtime |
| Rebuild warranty | 1 year, unlimited hours | 12-month warranty after rebuild delivery with no hour limit, including periodic inspections during the warranty period |
| Super warranty | 12,000 hours / 3 years | With MES daily-check maintenance and MES service filters; whichever comes first |
Safety Management · 0 HPI / 0 LTI
83% in SU's 2025 yearly SHEQ audit — the highest among peer contractors. Annual targets: zero high-potential incidents, zero lost-time injuries, MTC+FAC+RWC below 3.
On-site Work Controls
Baseline risk assessment; daily JSA / Take 5 by workers; PTO twice a week by foremen; VFL twice a week by supervisors — high-risk work listed in the project safety plan.
Training & Meetings
A standing safety committee, daily toolbox meetings, safety training every two weeks and a monthly all-staff safety meeting.
Health & Environment
Full PPE, yearly medical checks (Medixx), oil-spill kits and an Environmental Management Plan (EMP), with HSE indicators in the annual review.
Put your equipment assurance needs to the test
Tell us your machine models and operating conditions — a data-backed service proposal within 48 hours.
Our Facilities, Seen for Real
Workshops, warehouses and test rigs at both operating centres — our capability, in pictures.